(877) 747-ROCK

“Rock-Solid” Safety and Accountability

On Site Rock Crushing & Breaking

working crusher.jpgMost new construction in the region involves some method of rock removal.  In the old days, blast contractors were just responsible for drilling down to the proper depth and installing and igniting the explosives before moving on to the next job. The general contractor in charge of the site was left with piles of shot rock that had to be disposed of and had to find aggregate to bring back in as fill.

The beauty of NQS' crushers is that you can get into mass excavation, reduce the shot rock to compactable structural fill and help the site balance and get rid of the import/export issue of trucking. That's where these crushers really make sense, helping to balance the site. Potential uses for the crushed rock include 3-in. minus as sub-base for road construction, 3-in. minus as engineered backfill for new construction and class 1 rip rap (8-in. minus) for ground cover along highways. NQS typically crushes waste rock down to 2-5-in. material, a practice that has nearly eliminated the problem of waste rock.

impact crusher.jpg             crusher.jpg